Tuesday morning the trenches for the foundations of the benches were prepared. All preparation works were checked to be level.
After excavating and levelling the formwork was constructed. We needed to make do with the material we had. The timber was short, irregularly shaped and simply not enough. Creative formwork construction was course for the day, with timber, steel sheet and bricks.
When the concrete arrived the excess was used as a blinding for the paving edge.
The first post box is close to being completely sanded and primed.